OLI Middle East: instant support and local stock to build Shobha Hartland

Sprawling through the Roads of Dubai, one can only be amazed at the pace at which an entire city has come alive in between a desert. Few Kilometres away from Downtown Dubai is an entire community by the name of Shobha Hartland, developed by master builder Shobha Developers, that has started to thrive and have gained a reputation for themselves as a premium luxury builder in the construction sector.

In the real estate world if there is one word by which they would describe Shobha, the one word that would come into everyone’s mind is “FINISHING”. Not compromising on the final quality and ensuring deadlines are met is a critical factor with major developers such as SHOBHA.

OLI VIBRATORS, have been playing a small but important part in ensuring Deadlines are met using their MVE 290-6, known in the construction world as SHUTTER VIBRATORS or FORMWORK VIBRATORS, and that can be easily moved and fixed to the formworks present on site for the best external finishing by clearing out voids. Even though it may seem at first sight a simple process, there’s more to it that meets the eye.

With various pouring times, changing operators & different design structures at 5 different locations, OLI was able to provide a complete solution with the MVE 290-6 to run across 5 sites with the help of the 3 and 4 outlet converters CMT55 and CMT85 along with the MSP extension boxes.

The Use of extension boxes MSP ensured that the total purchase was well below the planned budget and allowed the operators to run up to 7 units of MVE 290-6 with only 1 converter of CMT85. When compared with other brands, that were providing the same solution for 3 times the price compared to OLI. Another key factor on choosing OLI was the delivery timelines that were met due to the availability of stock in OLI’s Warehouse in Dubai.

With safety being the most important aspect at any site, the MVE 290/6 runs at 42V giving 6000rpm, thus allowing there is no compromise in the quality of compaction. The movable clamp CLW and CLS, with a total weight of 9kg, help the operators to move them from one point to another based on the progress of the pouring.

 

OLI Middle East technical team was also involved in the training of the operators and the foremen on the placement and correct fixing procedures on the wooden and steel formworks. Based on the forecast provided on the future site requirements, OLI have also added to their fleet 1 phase Control Panel Options along with the existing 3 phase converters.